- Home
- Flow
- Landing Pages
- Myers Next Gen Pasadena Case Study
How one pump makes life easier for a wastewater department’s crew
A downstream hospital, hotels, and a uniquely challenging wet well design made a specific lift station a constant maintenance headache. Watch how this Texas wastewater team reduced unscheduled pump pulls and achieved months of trouble-free operation with the Pentair Myers Next-Gen pump.
Clogged municipal wastewater collection systems can result in decreased flow capacity, contamination of water sources, and other costly repairs like pump maintenance or replacement.
Pentair Myers MNG Series Pumps can help you win the battle against modern flushables by tackling today’s most challenging clogging culprits.
In this case study, learn how one public works department wins the battle with a Myers MNG pump installed in its most challenging lift station downstream from a major hospital and multiple hotels.